SUMMARY

Ability of construction of induced infiltration well-field of large capacity in Th­îng C¸t (Tõ Liªm, Hµ Néi)

NguyÔn V¨n §¶n, Tèng Ngäc Thanh,

NguyÔn ThÞ H¹, TriÖu §øc Huy, NguyÔn V¨n §øc

According to obtained hydrogeological investigation results, for reaching water demand in the Water Master Plan of Hµ Néi City, there are 300,000 m3/day of lacking water source. The various projects are considered to be selected such as groundwater exploitation by new method or taking water from §µ, Red rivers… The construction of water plant is divided into two phases: first phase with 150,000 m3/day of capacity, the second one with 150,000 m3/day of capacity. This paper touches upon the ability of construction of induced infiltration well-field along the Red River of large capacity in Th­îng C¸t (Tõ Liªm, Hµ Néi). In short time it can reach the water demand in first phase, then it can be expanded to increase the capacity reaching the water demand of the Water Master Plan.